High-risk work, authorized before it starts.
ForgeSOP puts hot work, confined space, lockout and work-at-height permits on one system, with approval gates, isolation checks and e-signed handback your crews can run from a phone.
14-day free trial · No credit card · $7 per user / month

Built for the permit rules you’re audited against
- OSHA 1910.146
- OSHA 1910.147
- OSHA 1910.252
- NFPA 51B
- HSG250
- ISO 45001
Every permit raised, checked and closed in one place.
Hot work, confined space, isolation and work at height, run on the same record as the SOP, the risk assessment and the people doing the job.
One permit system for every high-risk job.
Build each permit type once, with the precautions, isolations and sign-offs it needs. Crews raise a permit from a phone and the right checks come with it.
- Hot work, confined space, LOTO and work at height
- Precautions and checks built into each template
- Linked to the SOP and JSA for the job
Weld repair on transfer line T-4
- 1Combustibles cleared within 35 ft of the work
- 2Gas test recorded below 10% LEL
- 3Extinguisher and fire blanket at the work point
- 4Fire watch named for 60 min after the job
A permit only issues when every gate is green.
Approvers sign with re-authentication, and the permit checks what people forget: isolation in place, contractor insurance in date, the right competency on the crew.
- Named approvers with e-signature
- Lapsed insurance or training blocks issue
- Gates on asset state and isolation
Know what’s live on every site, right now.
One board shows every open permit, where it is, who holds it and when it runs out. Permits expire on time, so nothing stays open after the shift.
- Open and expiring permits across all sites
- Automatic expiry, with a warning before it lapses
- Filter by site, permit type or contractor
| Permit | Type | Where | Expires |
|---|---|---|---|
| PTW-0187 | Hot work | Tank farm | 16:00 |
| PTW-0179 | Confined space | Tank 3 | In 30 min |
| PTW-0183 | Isolation | Filler 2 | 17:30 |
| PTW-0176 | Work at height | Roof A | Closed 11:05 |
Permits expire on time. Nothing stays open after the shift.
Closed out, handed back and on the record.
When the job is done, the holder confirms the area is safe, isolations come off in order and the issuer signs the handback. The permit stays linked to the asset and the audit trail.
- E-signed handback against the issued permit
- Isolations removed and verified in sequence
- Full permit history on the asset timeline
- RequestedM. Alvarez · 07:35 · JSA attached
- Approved and issuedR. Iyer, area authority · 07:52 · valid 08:00 to 16:00
- Work completeFire watch ended 15:10 · area left safe
- Handback signedD. Mensah · 15:24 · bound to the issued permit
sha256 3a91…d2f8Also explore EHS & incident management, inspections & audits, CAPA management, resources & contractors and risk management — or see every module on one page.
Permit lifecycle
Every permit follows the same controlled path.
Request, assessment, authorization, the work itself and the close-out are stages of one record, so nothing is retyped and nothing is skipped.
Request
The crew raises a permit from a phone, picking the job, the asset and the permit type.
Assess
The JSA and precautions come from the template and are confirmed at the work point.
Authorize
Gates are checked, then the approver signs with re-authentication and the permit issues.
Work
The permit is live on the board until the job is done or the clock runs out.
Close out
Isolations come off, the area is handed back and the record joins the audit trail.
Built for the permits you issue every day.

Welding, cutting and grinding, with the fire watch on record.
Combustibles cleared, the gas test logged and a fire watch timed after the job ends, all confirmed before the permit closes.
- Precaution checklist for every job
- Gas test readings recorded
- Timed fire watch before close-out
Permits that stand up to any audit.
Every request, approval, issue and handback is signed, timestamped and chained to the entry before it. Your auditor can verify the trail without taking our word for it.
- Hash-chained audit trail
- Append-only and tamper-evident.
- Re-authenticated signatures
- On issue and on close-out.
- Contractor gating
- Lapsed insurance blocks new permits.
- 7-year retention
- Full export with proof if you leave.
9f2c…a41e51b0…7c093a91…d2f80b7a…f912Each entry carries the previous entry’s hash. Edit one, and every later hash breaks.
Permits your crews will actually use.
A permit only protects people if it is filled in at the job, not back at the office. ForgeSOP is built for the people holding the permit.
Raise a permit from any phone
Pick the job and the permit type, confirm the precautions and attach photos in a few taps.
Always the current procedure
Each permit links to the approved SOP and JSA, so nobody works from an old printout.
Contractors on the same system
Subcontractors work under site-scoped access that ends when their job does.
Permit to work, answered.
What safety teams ask before they move permits off paper. Still curious? A demo answers the rest.
What is a permit to work system?
A permit to work system is a formal, documented process that controls high-risk jobs such as hot work, confined space entry and work on isolated equipment. It records the hazards, the precautions and who authorized the work before the job starts.
Which permit types does ForgeSOP support?
ForgeSOP covers hot work, confined space entry, lockout/tagout (LOTO) and isolation, and working at height. Each permit type has its own template with the precautions and sign-offs that job needs.
How does ForgeSOP stop a permit being issued unsafely?
Issuing a permit requires the approver to re-authenticate, and the permit checks asset state before it issues. A lapsed contractor insurance certificate blocks new permits automatically, so the gap is caught before the work starts rather than at the next audit.
Can contractors work under ForgeSOP permits?
Yes. Contractors work under site-scoped access with an expiry date, and their insurance, certifications and scope are held on the approved-vendor list. If a certificate lapses, new permits for that contractor are blocked until it is renewed.
How are permits closed out and handed back?
When the work is complete the close-out is signed with re-authentication against the hash of the issuing permit, so the handback is bound to the exact permit that was issued. Permits also expire on time, so none stay open after the shift.
Will the permit record stand up in an audit?
Every request, approval, issue and close-out is written to a hash-chained, append-only audit trail with the signer and timestamp. For any incident, the file shows the permit, the JSA and the SOP version that were in effect.
Forge better processes
One platform. Always audit-ready.
Bring SOPs, checklists, audits, incidents, and CAPAs into one connected system for safer, clearer, and more consistent operations.
No credit card required · Built for teams that run on process


